Rough in installation, Connect cold inlet connect hot inlet – Blu Bathworks TSP210 User Manual
Page 3

2014-01
1 866 907 0122 blubathworks.com
®
2
Rough In Installation
TSP210 (Refer to illustration 1)
TSU220 (Refer to illustration 2)
Note: Rough-in depth for these products are provided on the protective mud guards.
1. Run
1
⁄
2
" (12.5mm) hot and cold supply lines. The spread between supplies is 1½" for TSP210 & 8" for TSU220
on center and is NOT adjustable.
2. Install a
1
⁄
2
” (12.5mm) sweat x
1
⁄
2
” (12.5mm) female IPS adapter onto each supply line.
3. Verify the supplies are secure, level, at the proper spread and equal depths.
4. Connect the rough-in to the water system, hot water connected on the left and cold water connected on the
right.
5. Align and level the faucet rough-in and secure the faucet rough-in into the wall.
6. Verify the supplies and faucet body are secure, then turn on the supplies and check for leaks.
1
FOR TSP210
Connect cold
inlet
Connect hot
inlet
1
2
3
4
5
6
1
⁄
2
”
Hot
inlet
1
⁄
2
”
Cold
inlet
Connect cold
inlet
Connect hot
inlet
1
2
3
4
5
6
1
⁄
2
”
Hot
inlet
1
⁄
2
”
Cold
inlet