Blu Bathworks TSP510 User Manual
Page 5
2014-02
1 866 907 0122 blubathworks.com
5
5
Provide a hole
in the finished floor
of 2 1/2" - 3 1/8"
(ø65~ø80)
4
3
Cold
Hot
5
Test the level
Adjust all leveling
screws to ensure rough-in
is securely fastened and level
prior to floor finishing and
mounting fixture body.
27
7
8
1
2
6
60
Two outlets
3-Ø12
Hot
inlet
When installing the rough-in valve into or
on top of the floor, ensure both the location
and orientation properly relate to the bathtub.
1. If mounting the rough-in onto finished floor surface the rough-in
will be visually exposed. A second escutcheon cover plate is required.
2. If mounting the fixture on wood floor construction additional solid
blocking is required to secure and mount the rough-in.
Refer to diagram.
Test the tap for water
pressure, and check for
leaks prior to proceeding
to next steps.
Edge of bath tub
Cold
inlet
Drill 3x1/2" (12mm)
holes for anchor bolts
for concrete install
Depth of rough-in
from finished floor.
2"-2 1/2" (50-60)
• Securely fasten rough-in
into or on top of floor
surface
• Connect hot and cold
water lines into rough-in
inlets
• Check rough-in to
ensure it is level
Leveling screws
Rough-in Ø 4 1/2"
Ø 4 1/2"
5
6
Insert the main body
into the floor rough-in,
tighten the nut using the
tightening extension bar
by inserting it into the holes
in the side of the fastening
nut. When the body is secured
place the escutcheon . Cover
plate over the floor opening.
7
8
10
11
Install the spout,
shower hose and
shower, and test.
9
Provide a hole
in the finished floor
of 2 1/2" - 3 1/8"
(ø65~ø80)
4
3
Cold
Hot
5
Test the level
Adjust all leveling
screws to ensure rough-in
is securely fastened and level
prior to floor finishing and
mounting fixture body.
27
7
8
1
2
6
60
Two outlets
3-Ø12
Hot
inlet
When installing the rough-in valve into or
on top of the floor, ensure both the location
and orientation properly relate to the bathtub.
1. If mounting the rough-in onto finished floor surface the rough-in
will be visually exposed. A second escutcheon cover plate is required.
2. If mounting the fixture on wood floor construction additional solid
blocking is required to secure and mount the rough-in.
Refer to diagram.
Test the tap for water
pressure, and check for
leaks prior to proceeding
to next steps.
Edge of bath tub
Cold
inlet
Drill 3x1/2" (12mm)
holes for anchor bolts
for concrete install
Depth of rough-in
from finished floor.
2"-2 1/2" (50-60)
• Securely fasten rough-in
into or on top of floor
surface
• Connect hot and cold
water lines into rough-in
inlets
• Check rough-in to
ensure it is level
Leveling screws
Rough-in Ø 4 1/2"
Ø 4 1/2"
5
6
Insert the main body
into the floor rough-in,
tighten the nut using the
tightening extension bar
by inserting it into the holes
in the side of the fastening
nut. When the body is secured
place the escutcheon . Cover
plate over the floor opening.
7
8
10
11
Install the spout,
shower hose and
shower, and test.
9
2
3