Installation Sequence (continued)
Note:
any remaining protective packaging should be removed only after the bathtub installation and other construction work in the
bathroom is fully finished.
•
Level the feet of the tub. Lock the bathtub legs into position
by tightening the adjoining nut once an accurate level is confirmed.
5
4
•
The water outlet pipe should be connected.
•
Connect integrated overflow tube to outlet drain.
6
•
Apply silicone to the feet of the bathtub that stands on the floor.
7
•
When the installation is completed, the bathtub is taken down from
the supports. ( ie 2 x 4x4’s)
If necessary, installation is completd
by applying silicone at several points
between the bottom panel and floor.