beautypg.com
Table of contents
4.1.4
Mounting of the Control Panel
14
4.1.5
Fitting the power supply cable
15
4.2
Connecting the Control Panel
16
4.2.1
Connecting cables
4.2.2
Protective Earthing
5
Operating Instructions
17
5.1
Switching the Control Panel on and off
5.1.1
Switching on
5.1.2
Shutting down and switching off
5.2
Operation 17
5.2.1
Setting the transmission rate
18
5.3
Servicing and maintenance
5.3.1
Cleaning
5.3.2
Maintenance 18
5.4
Emergency procedures
5.5
Shutting down
5.5.1
Disposal
6
Troubleshooting 19
7
Assembly dimensions
20
8
Technical Data
29
9
Appendix 30
9.1
Beckhoff Support and Service
30
9.1.1
Beckhoff branches and partner companies
9.1.2
Beckhoff company headquarters
9.2
Approvals for USA and Canada
31
9.3
FCC Approvals for the United States of America
9.4
FCC Approval for Canada
2
CP29xx