Basic safety measures, Ventilation of the battery pack location, Operator's obligation to exercise diligence – BECKHOFF C9900-U330-0010 User Manual
Page 5
General Notes
Basic safety measures
i
Note
The battery pack must only be used in conjunction with the C9900-
P209, C9900-P214, C9900-P216 or C9900-P218 power supply unit!
Danger
Switch off the power supply of the Industrial PC during installation!
During installation and removal of the battery pack, the power supply of the
Industrial PC must be switched off.
Achtung
Ventilation of the battery
pack location
When storing, installing and operating the battery pack, the regulations of
VDE 0510 Part 2 / EN 50272-2 or the applicable national regulations must
be complied with.
It must be ensured that the battery
pack location is suitably ventilated.
Operator's obligation to exercise diligence
Warning
Only appropriately trained staff may install the battery pack!
The operator must ensure that only appropriately trained electricians deal
with installation and wiring of the battery pack.
C9900-U330-0010
3