beautypg.com

New build / new plasterboard, Full wet skim finish – Amina BackboxCV345 V1.2 User Manual

Page 10

background image

New build / new plasterboard

Full wet skim finish

BackboxCV alignment required for plastering

The front face of the speaker should be flush
with the face of the new wall/ceiling if the
BackboxCV has been correctly installed.

This method positions the speaker to be skim
plastered over during the process of the
entire wall/ceiling being plastered.

raw plasterboard
surface

For new plasterboard walls /ceilings that have
not yet been plastered.

07