Venting installation instructions – Desa T32N-a SERIES User Manual
Page 13

www.desatech.com
116646-01D
13
HORIZONTAL SYSTEM INSTALLATION USING TWO 90° ELBOWS
The following configurations show the minimum vertical rise requirements for a horizontal system
using two 90° elbows.
VENTING INSTallaTION INSTRUCTIONS
Continued
Figure 17 - Horizontal Termination Configuration for Venting Using Two 90° Elbows
Venting with Two 90° Elbows
Horizontal (H
1
) +
Vertical (V) Horizontal (H
1
) Horizontal (H
2
)
5' min.
' max.
6' max.
6' min.
4' max.
1' max.
7' min.
6' max.
18' max.
8' min.
8' max.
0' max.
0' max.
8' max.
0' max.
45° Elbow
Figure 18 - Horizontal Termination Configuration for Venting Using Two 90° Elbows
with Termination at 90° with Fireplace
Venting with Two 90° Elbows
Horizontal (H
1
) +
Vertical (V) Horizontal (H
2
)
5' min.
6' max.
6' min.
1' max.
7' min.
18' max.
8' min.
0' max.
0' max.
0' max.
45° Elbow