Unpacking, Cables - quantity guide – Datapath Vision800X User Manual
Page 2
Unpacking
Your packing box should contain the following items:
• The Vision800X chassis with the S-Link card pre-installed.
• H-Link card (if the Vision800X is suplied as part of a complete configured system with a Vision800 host
machine then this H-Liink card will be pre-installed in the Vision800)
• Cables (See quantity guide Fig.1)
Note:
When shipped, the Vision800x may contain transit packaging INSIDE the chassis, this must be re-
moved prior to operation.
To remove the packaging, remove the chassis lid via the four screws, two located on each side of the
case lid.
Cables - Quantity Guide
x2 Genlock2
Cables
x1 Ex-Cable
Fig.1