INSTALLATION

1. Disconnect all power and remove cables from the Data Silo chassis.

2. Open the Data Silo chassis to gain access to the internal cables and rear

panel I/O connectors. Refer to the Data Silo User's Guide for more information

on this procedure.

3. Remove existing internal SCSI ribbon cable if installed.

4. Verify that all devices within the Data Silo chassis have any and all termination

disabled. Termination is provided by the DCW4RAID-KIT and RAID controller.

RAID Cable Kit

The DCW4RAID-KIT, an internal cable kit for the StorCase

™

Data Silo

®

9-bay rack or

tower chassis, allows the DS400 and DS500 to be used with SCSI RAID configura-

tions where the RAID controller resides within the Data Silo.

The DCW4RAID-KIT includes two (2) drive channel cables, each with 5 device

connectors and an inline LVD/S.E. terminator, and one (1) host channel cable for

connecting to the rear panel of the Data Silo (see figure below).