Setup guide – NEMO Equipment MOK LIN User Manual
Page 4

Setup Guide
1. To set up the Link™ between two Moki™ tents, zip a connection panel on each
end of the Link™. The connection panel is similar to the upper vestibule panel,
but has red Velcro® and no zipper flap.
2. Insert a vestibule pole into each pole sleeve of the Link™. Attach the end tips
of the poles to the grommets in the Link™ and tighten the webbing.
3. Place the pole tips in the corresponding grommets of each Moki™ corner
anchor. Zip both connection panels to the corresponding tents.