beautypg.com

Parts, Scope, Scope three steps of installation – Grandview GPCN-D User Manual

Page 2: Three steps of installation

background image

1-1

1-2
1-3

2-1

2-2

2-3

3-1

3-2

3-3

2-6

2-4

2-5

1

3

2

Install on

the flat

ceiling

GPCN-D200

GPCN-D3040

GPCN-D4060

Connect

main bar

and adjuster

(screws of

accessory ④)

Parts

GPCN-D is combined by GPCN and GPD

GPCN Main Bar Overview
1-1 Top Cap
1-2 Fixation
1-3 Sliding Adjusting Hole
2-1 Main Bar
2-2 Subsidiary Bar
2-3 Front Ornament Board
2-4 Back Ornament Board of Main Bar
2-5 Back Ornament Board of Subsidiary Bar
2-6 Moving Button

GPD Adjustment Overview
3-1 Adjuster
3-2 Hanging Button
3-3 Horizontal Adjusting
Hole
4-1 Installation Bracket
4-2 Vertical Adjusting Hole
4-3 Installation Arm
4-4 Adjustable Screw
4-5 Sliding Installation
Button
4-6 Installation Base

Accessories:
① M6x25 Tapping Screw (4sets)
② 6x50 Wood Screw (4pcs)
③ M5x8 Philips Screw (2pcs)
④ M5x16 Philips Screw (6pcs)
⑤ M5x8 Philips Screw (4pcs)
⑥ M4x8 Philips Screw (4pcs)
⑦ M3x8 Philips Screw (4pcs)

Scope for installation (Installation hole of projector):
Maximum scope for installation:360mm diameter
Minimum scope for installation:50mm diameter

Note: Connect the installation arms to the projector conversely for different installation
holes of projector.

Scope

Maximum diameter: 360mm

Minimum diameter: 50mm

Scope for installation (H is the distance between ceiling and projector)
The H of GPCN-D200 is 200mm
The H of GPCN-D3040 is 300mm~400mm
The H of GPCN-D4060 is 400mm~600mm

Scope

Three steps of installation

Install the fixation on the ceiling (screws of accessory ① or ⑧ )as
figure 1, and the fixation also can be installed on the ceiling which
angle is less than 15°as figure 2. GPCN-D can be installed to the
concrete-roof with ceiling or without ceiling, such as figure 3.

Connect the GPCN Main Bar Overview to the fixation (screws of
accessory ④ ). Store the power wire, and then fasten the front and
back screws of main bar. Finally, install the ornament board of
main bar as figure 4 and figure 5.

Hang the installation bracket (projecter has been installed) to the
adjuster as figure 6. And then put in the screws (accessory ③).but
do not fasten.Pull the top cup to the main bar, and then invaginate
the spring as figure 7

Install on

the ceiling

which angle

is less than

15°

Three steps of installation

figure 1

figure 2

figure 3

figure 4

figure 5

15°

figure 6

figure 7

3-3

4-1
4-2
4-3

4-5
4-6

4-4

H

H

H