beautypg.com

Installation, 5 appliance location, 6 appliance installation – Glow-worm Clearly Hybrid - Universal Module User Manual

Page 10: 1 scope of delivery, 2 recommendations before installing

background image

0020096324_01.1 - 09/10 - Glow-worm

- 8 -

INSTALLATION

5 Appliance

location

• Before choosing a site for the appliance, carefully read the

safety warnings and installation manual.

• Ensure that wall to which the appliance will be mounted on is

structurally safe in order to support the weight of the appliance.

• Ensure that the space that the appliance is to be installed

within allows the appliance to be installed and the clearances
maintained. This will ensure that the connections to the water
can be accessed and inspected (see chapter Clearances).

• The appliance must be installed in a room protected from

freezing. Take all necessary precautions.

• Explain these requirements to the appliance user.

6 Appliance

installation

6.1

Scope of delivery

5.1

5

5.2

4.5

4.4

4.3

4.2

4.1

4

1

3

3.1

5.3

5.4

5.5

2

Key
1

Hydraulic module

(x1)

2

Hydraulic module cover

(x1)

3

Connector plate (*)

(x1)

3.1

Connector plate (Réf. 0020093953)

(x1)

4

Elements supplied with the connector plate (*)

4.1

Safety valve pipe

(x2)

4.2

Bag of seals

(x1)

4.3

Bag of connectors

(x1)

Heat pump return adaptor

(x1)

Heat pump outlet adaptor

(x1)

Heating return adaptor

(x1)

Heating outlet adaptor

(x1)

Boiler return adaptor

(x1)

Boiler outlet adaptor

(x1)

4.4

Bag of seals

(x1)

Seal ¾"

(x12)

4.5

Connector strip

(x1)

5

Bag of documents

(x1)

5.1

Proof of purchase card

(x1)

5.2

Guarantee request

(x1)

5.3

User manual

(x1)

5.4

Installation manual

(x1)

5.5

Drilling template

(x1)

(*)

Ordered separately

• Check the contents of the packages.

6.2

Recommendations before installing

6.2.1

Heating circuit design

The heat

emitters

may be low temperature (

under-

fl oor heating,

low-

temperature

radiator ...)

or

high temperature (cast iron

radiator ...).

The pipe

work is

to be determined using a fl ow / pressure curve.

The distribution will be determined by the fl ow corresponding to
the power actually required, regardless of the maximum power
that can be provided by the installation’s generators.

Installation pipework must be designed and installed to ensure
venting of air from the system is possible.

The total volume of water for the heating circuit depends,
among other factors, on the cold static load of the boiler’s
expansion tank. It is recommended that a drainage valve be
installed at the lowest point of the installation.

Thermostatic radiator valves should be fi tted to all radiators
with the exception of rooms in which

the room thermostats are

installed.

-

In existing installations, the radiator circuit must be fl ushed
prior to installing the new appliance.

-

If a system component is not put in place immediately,
protect the different connections so that the plaster and paint
does not spoil water tightness for later connecting.

INSTALLATION