beautypg.com

1 operator position – DoorKing 6100 User Manual

Page 12

background image

6050-065-L-11-08

10

SECTION 1 - INSTALLATION

Prior to beginning the installation of the swing gate operator, we suggest that you become familiar with the
instructions, illustrations, and wiring guide-lines in this manual. This will help insure that your installation is
performed in an efficient and professional manner.

The proper installation of the vehicular swing gate operator is an extremely important and integral part of the
overall access control system. Check all local building ordinances and building codes prior to installing this
operator. Be sure your installation is in compliance with local codes.

1.1 Operator Position

35”

90°

90°

90°

Note: 2” thick gate Illustrated.

4”

3”

Gate Bracket

An imaginary straight line drawn

from the closed gate bracket

through the open gate bracket

MUST intersect the

operator output shaft.

For pad or post mount ,

convenience open or

standard with the gate

opening 90°.

See 1.9 for gate’s opening wider than 90°.

Minimum distance

required for arm

clearance in the

open position.

Note: The operator can be placed further away from the open gate than
shown as long as the imaginary straight line drawn from the closed gate
bracket through the open gate bracket intersects the operator output shaft.

34”

12”

43”

Closed Gate

Open Gate

21.25”

Convenience Open

6100 Cover

(See above detail)

Standard Operator

Cover

12”

12”

Closed Gate

Closed Gate

3”

5”

Output shaft is offset 1” from center.
The open gate will be 1” closer on one
side of the operator OR 1” further away
on opposite side of operator as shown.

Operator

Output

Shaft

Open Gate

Open Gate

Centerline

7.25”

6.75”

43”

6100 Convenience Open Operators ONLY:

Operator

Output

Shaft

26”

This manual is related to the following products: