beautypg.com

Warning – EarthQuake 7065V User Manual

Page 12

background image

OPERATOR INSTRUCTIONS ANd PARTS

SRT Models 7055 & 7065V

Page 1

GetEarthquake.com

800-345-6007

reverse cable

forward cable

upper jam nut

lower jam nut

depth regulator
bracket

depth regulator lever

detent pin

dO NOT AdjUST TILLING dEPTh UNLESS dRIvE
SAFETY CONTROL LEvERS ARE RELEASEd TO
NEUTRAL POSITION.
ALWAYS SET ThE dEPTh REGULATOR LEvER IN
ThE TRANSPORT POSITION BEFORE STARTING
ENGINE, ThAT IS, PLACE ThE dETENT PIN IN
ThE hIGhEST hOLE OF ThE dEPTh REGULATOR
LEvER.

WARNING

!

dEPTh REGULATOR LEvER

Tilling depth is controlled by the height of the depth regulator lever.
To adjust tilling depth.

(SEE FIGURE 4)

1. Remove detent pin.
2. Raise the depth regulator lever to position tines at chosen tilling

depth.

3. Align hole in depth regulator lever with hole in depth regulator

bracket and replace detent pin.

Depth Regulator Lever Down = Shallower tilling. Place the
detent pin in the top hole of the depth regulator lever for shallowest
tilling.
Depth Regulator Lever Up = Deeper tilling. Place the detent
pin in the bottom hole of the depth regulator lever for deepest
tilling.

BELT TENSION AdjUSTMENT

Proper belt tension is critical to good performance. After 1/2 hour of
operation, all cables may have to be adjusted due to initial stretch.
Thereafter, check tension after every 2 hours of operation.
To increase belt tension: (SEE FIGURE 5)
1. Loosen upper jam nut. Turn nut up cable in 1/8” increments.
2. Tighten lower jam nut.
3. Check adjustment.
This procedure can be repeated until conduit adjustment bolts are
fully adjusted. If no more adjustment can be made, belt may have to
be replaced.

FIGURE 4

FIGURE 5