beautypg.com

Warning – EarthQuake 7055 User Manual

Page 11

background image

OPERATOR INSTRUCTIONS ANd PARTS

SRT Models 7055 & 7065V

Page 11

GetEarthquake.com

800-345-6007

WhEEL LOCk PINS

Place wheels in tilling position.
1. Remove lock pin. Align hole in axle with hole in wheel hub.

(SEE

FIGURE )

2. Insert lock pin through holes, fold lock pin ring to secure pin to

axle.

3. Firmly lock wheel and axle together before tilling.
4. Repeat for other wheel.

NOTE: Always have both wheel lock pins in or out. Do not
operate tiller with only one wheel locked.

To place wheels in free-wheel position.
1. Remove lock pin. Slide wheel inward toward machine.
2. Insert pin in axle only.
3. Wheel should turn freely on axle.

hANdLEBAR hEIGhT AdjUSTMENT

Adjust handlebar height.
The ideal height of the handlebar varies with operator height and the
depth of tilling. To adjust handlebar height:

(SEE FIGURE 3)

1. Unscrew nuts and remove top and bottom bolts on each side.
2. Align handlebar to desired holes on the lower handlebar mount.
3. Install bolts and nuts. Retighten.

Wheel lock pin in free-wheel position.

(axle hole only)

NEvER START ENGINE OR OPERATE TILLER WITh
WhEELS IN FREE-WhEEL POSITION. ThE FREE-
WhEEL POSITION IS FOR TRANSPORTING ThE
TILLER LONG dISTANCES OvER LEvEL GROUNd-
-dO NOT ATTEMPT TO MOvE ThE TILLER UP OR
dOWN STEEP GRAdES IN ThE FREE-WhEEL
POSITION.

WARNING

!

height

adjustment holes

lock nuts

height

adjustment bolts

height

adjustment bolts

FIGURE

FIGURE 3