Main frame assembly – Deltech Fitness DF930- Lat Pulldown with Pec Dec User Manual
Page 11
(NOTE: THE NUTS USED ON THIS
BENCH ARE LOCK NUTS, THIS MEANS
YOU MUST TIGHTEN THEM DOWN
PAST THE PLASTIC INSERT.)
INSTALL THE WEIGHT SLIDE ASSEMBLY ONTO THE BACK SUPPORT (A) (*NOTE THIS
STEP IS NOT NEEDED IF YOU ARE INSTALLING THE DF935 STACK KIT)
NEXT ASSEMBLE THE UPPER PULLEY FRAME (G) ONTO THE FRONT AND BACK SUP-
PORTS (A,B) USING THE M10 x 25MM BOLTS(HH) AND M10 WASHERS (II) . NOW
ASSEMBLE THE 3 ½” PULLEYS (AA) INTO THE UPPER PULLEY FRAME (G) USING THE
M10 x 76MM BOLTS (FF), M10 NUTS (JJ) AND THE PULLEY BUSHINGS (BB). ( DO NOT
TIGHTEN THE PULLEYS- YOU WILL NEED TO REMOVE THEM TO INSTALL THE CABLE)
INSTALL THE 2” x 3” CAPS (V) INTO THE UPPER PULLEY FRAME (G).
MAIN FRAME ASSEMBLY
WEIGHT SLIDE ASSY
JJ
HH
A
G
B
HH
HH
HH
I I
I I
I I
I I
AA
AA
FF
BB
BB
V
V