beautypg.com

Procedure (continued) – Da-Lite Automated Confidence Monitor Stand User Manual

Page 4

background image

4

2. Insert the Caster stems or Glide stems into the Base.

See Figure 1. Must go in straight.

3. Insert tube enclosures shown.

4. Insert two Columns into the Base and install the fasteners

shown. Leave loose at this time.

5. Slide the Top Assembly down the Columns. See Figure 2.

Position the Top by tightening both Knobs. Make sure unit
is level.

6. Tighten the fasteners at the bottom of the Columns.

7. Attach Zee-Bar Plate to Hinge. See Figure 3.

Figure 2

8. Attach the Links to the outside of the Zee Bar Assembly.

9. Mount the Hanging Brackets to the back of the Plasma Unit

utilizing all the fastener points recommended by the plasma
manufacturer. See Figure 4.

Figure 4

Figure 1

A

13

12

11

G

Knobs To Hold

Position

Plasma Unit

Hanging

Bracket

Figure 3

D

F

Link

C

Hinge

Procedure (Continued)