Installer Final Checklist

16

GENERAL

❏ Placement of Unit.

❏ Specified clearance maintained to cabinet

surfaces.

❏ Unit Level- front to back, side to side.

❏ All packaging material and tie straps removed.

ELECTRICAL:

❏ Receptacle with 15 ampere current

protection is provided for service cord
connection.

❏ Adequate ground connection.

GAS SUPPLY:

❏ Connection: 1/2 NPT with a minimum 5/8”

diameter flex line

❏ The pressure regulator which is connected to

the manifold is set for 4.0”-for Natural Gas

❏ Manual gas shut off valve installed in an

accessible location.

❏ Unit tested and free of gas leaks

OPERATION:

❏ All internal packing materials are removed, i.e.

below grates, around knobs, etc.

❏ Bezels centered on burner knobs and knobs

turn freely.

❏ Each burner lights satisfactorily, both

individually and with other burners operating.

❏ Flame adjustment for 3/8" soft blue cone

made on ports of each top burner.

❏ Low flame operation verified.

❏ All burner caps, burner rings and burner

bases correctly seated in position, level, and
do not rock or slide.

❏ Burner grates correctly positioned, level, and

do not rock.