Assembly – Desa TD120A User Manual
Page 5
www.desatech.com
122139-01A
5
Figure 1 - Base and Pole Assembly
ASSEMbLy
1. Install threaded poles into triangular base
as shown in Figure 1. Be sure to seat
poles fully inside base.
2. Install lower legs by pressing push tab
release and inserting into upper pole (see
Figure 2). Be sure push button is locked
in place.
3. Install 3 feet to lower legs as shown in
Figure 3. Be sure to tighten wing bolt after
installation.
Figure 2 - Installing Lower Legs into
Upper Poles
Figure 3 - Installing Feet to Lower Poles
Figure 4 - Attaching Tank Straps
Push Tab
Release
Wing Nut On
Inside of Foot
4. Install tank straps to propane/LP gas
cylinder as shown in Figure 4. Length of
strap from tank flange to end of clip should
be between 9" and 10" from tank flange.
This should maintain a 2" minimum clear-
ance from bottom of propane/LP tank to
ground.
9"-10"
Push Tab
Release in Hole
of Upper Pole
- FB-10BA (26 pages)
- GG30P (32 pages)
- WMP20 (32 pages)
- VN1000BTA (28 pages)
- GWP10T (32 pages)
- LCR16PT (56 pages)
- VN2000BTC (32 pages)
- R (40 pages)
- TC80 (16 pages)
- H.S.I. (40 pages)
- CGP20 (24 pages)
- RP30B (32 pages)
- FAS-5B (28 pages)
- GWP30T WMN20 (28 pages)
- BVDR24 (28 pages)
- TC100RNG (12 pages)
- 75-200 (32 pages)
- VP1600TB (24 pages)
- VGN30B (32 pages)
- CRN30 (32 pages)
- CG10N (26 pages)
- CGN30D (32 pages)
- GWN6 (60 pages)
- CGD3924NR (32 pages)
- FMH26TP (28 pages)
- CGN20L (24 pages)
- VF-18P-PDG (32 pages)
- SL18PT (56 pages)
- VSL18PT (56 pages)
- VGL30PRA (32 pages)
- VGL30NRA (32 pages)
- BLP35E (76 pages)
- CB36P (36 pages)
- VP1000BA (32 pages)
- VRL24NT (44 pages)
- VYM27NR/PR (28 pages)
- CGN30C (32 pages)
- 10542 (32 pages)
- FAS-10BB (26 pages)
- TC275 (12 pages)
- VN10 (20 pages)
- FBS-10BB (26 pages)
- GWRP10 (24 pages)
- FVFM27NR/PR (28 pages)