Installation instructions – Santec 708460 User Manual
Page 3

INSTALLATION INSTRUCTIONS
PAGE 03
708460_ _
2.
- Once it fixed and aligned properly then
screw in two machine screws on the top
of the cylindrical holders.
- They will tighten in the pedestal of the cylindrical
holder which were screwed in the wall at the start.
- Tighten them firmly.
- Now put the base cover caps on the threaded
projection of the base body.
- Put on the Personal hand held spray assembly
in the slotted groove as shown int he figure.
When screw is threaded in,
put on the cap on the threads
on the post
.
Water Inlet
W
a
ll
26.9”
f
2.2”
f
0.7”
See also other documents in the category Santec Accessories for water:
- 00YY-TD (3 pages)
- 00YY-TX (3 pages)
- 1072XL (4 pages)
- 1074XL (4 pages)
- 1120CD (4 pages)
- 1120LC (4 pages)
- 1120LL (4 pages)
- 1120TT (4 pages)
- 1131CD (4 pages)
- 1131LC (4 pages)
- 1131LL (4 pages)
- 1131TT (4 pages)
- 1132CD (4 pages)
- 1132LC (4 pages)
- 1132LL (4 pages)
- 1132TT (4 pages)
- 1134CD (4 pages)
- 1134LC (4 pages)
- 1134LL (4 pages)
- 1134TT (4 pages)
- 1150CD (4 pages)
- 1150LC (4 pages)
- 1150LL (4 pages)
- 1150TT (4 pages)
- 1155CD (4 pages)
- 1155LC (4 pages)
- 1155LL (4 pages)
- 1155TT (4 pages)
- 1170CD (4 pages)
- 1170LC (4 pages)
- 1170LL (4 pages)
- 1170TT (4 pages)
- 1320AA (4 pages)
- 1320AC (4 pages)
- 1320CA (4 pages)
- 1320CC (4 pages)
- 1320DD (4 pages)
- 1320FF (4 pages)
- 1322MA (4 pages)
- 1322MC (4 pages)
- 1322MD (4 pages)
- 1331AA (4 pages)
- 1331AC (4 pages)
- 1331CA (4 pages)
- 1331CC (4 pages)