Installation instructions, Illustration b, Description – Santec 4334GL User Manual
Page 2: Installation
DESCRIPTION
This product is precision engineered to provide satisfactory performance provided it is installed and operated in
accordance with our recommendations contained in this manual. In order to fully enjoy the comfort, safety and the
reliability of your pressure balancing valve, be certain to familiarize yourself with the contents of this manual.
SPECIFICATIONS AND DIMENSIONS
Minimum operating pressure 20 psi
Maximum operating pressure 145 psi
Maximum test pressure 500 psi
Hot and cold water inlets ½" IPS
Shower outlet ½" IPS
Flow capacity 5 USGPM@ 50 psi
Finished wall adjustment : see Illustration B
WALL LINE
78"
(1981 mm)
FLOOR
LINE
½”
½”
33"
INSTALLATION INSTRUCTIONS
PAGE 02
INSTALLATION
NOTE: Failure to follow these instructions may cause damage or improper operations and nullify the warranty.
ROUGH IN
- Make sure the water supplies are off.
- Remove all the trim items (plate and flange) before installation.
- Secure the valve firmly against the stud. Make sure the ½" shower outlet is in the up position.
- Make sure to flush or raise grouting on the tiled wall surface.
- Position the valve using the dimension shown in the illustration B.
(The distance between the center inlet of the valve and the finished wall should be between 1 5/8” and 2”).
Trim Plate
ILLUSTRATION B
1 5/8” - 2.0”
center of inlet
finished wall
HANDLE
HANDLE
SCREW
CAP
Foam Strip
PLATE
SCREWS
4334GL_ _-TM