beautypg.com

Installation instructions – Santec 3165VU User Manual

Page 2

background image

INSTALLATION INSTRUCTIONS

PAGE 02

1- Take the trim parts off the box.
Place the trim parts against the assigned wall location.
Make sure that the roller is leveled and the roller post positions are correct.
Leave 5’ to 5-1/4” space between the roller posts for the rollers.
Mark the roller post flange positions and remove the trims.

2- Using the mounting hardware position as reference, mark the screw hole positions
in the center of the post flange mark on the wall.

2a-

INSTALLING ON WOODEN SURFACE

- For wooden surface, the mounting hardware posts can be secured by
screwing the screws directly into the wall.

2b-

IF INSTALLING ON DRYWALL

- Using a drill, pre-drill holes for the toggles.
- Fold the toggle’s leg and insert it into the wall.
- The mounting hardware posts can be secured by screwing the screws
into the toggles.

2c-

IF INSTALLING ON SOLID/HARD SURFACE

- Measure the dimensions carefully.
- Using a drill, pre-drill the holes.
- Secure the mounting hardware posts by screwing the screws into
the wall.

3- Using the Allen key provided, loosen the roller posts’ set screws.
Slip the left roller post onto the left mounting hardware post
Align the roller post and secure it by tightening the set screw.

4- Insert the rollers with the spring onto the secured roller post.
Slip the right roller post onto the right mounting hardware post.
Insert the right side of the rollers into the right roller post.
Align the roller post and tighten the set screw firmly.

5- Check both roller posts to make sure they are firmly secured.
If not, tighten the set screws with the Allen key.

Santec Inc.

3501 Challenger Street, Torrance, CA 90503
Tel: (310) 542-0063 Fax (310) 542-5681
www.santecfaucet.com

05/03

5” ~ 5

1/4

WALL

WOODEN SURFACE

DRY WALL SURFACE

HARD SURFACE

3165VU _ _