Installation instructions – Santec 1355AC User Manual
Page 3
INSTALLATION INSTRUCTIONS
DIVERTER INSTALLATION
1
- Unscrew the pre-assembled diverter handle trim (3) from the diverter (12).
- Slip the valve body (12) up from the bottom of the tub through the appropriate hole. From tub
top, screw the handle trim (3) back onto the diverter. Make sure that the handle turns freely in
both directions.
- Align the handle lever and tighten the lock nut (11) firmly.
** The spout, handle valve bodies and diverter can be connected with flex hoses (not provide by Santec) or copper pipe soldering.
Please note that when soldering connections, do not use excessive heat. Excessive heat can damage the joints increasing
probability of leakage.
HAND SHOWER INSTALLATION
1
- Slip the guide tube (15), flange (14) and the washer down from the top of the tub through
the appropriate hole. Slip the mounting hardware (13) from the bottom of the tub, first the
crimped metal washer then the brass lock nut. Tighten the lock nut firmly.
2
- Wrap Teflon seal tape around the threaded outlet end (OUT) of the diverter valve. Connect and
tighten the 1/2” female side of hose (17) onto the outlet.
- Slip the other end of the hose (3/8”) up through the guide tube (!5), connect and tighten the
hose to the hand shower unit (16).
WATER TEST
- Turn on the cold water supply.
- Use the handle from the faucet set to turn the valve on and off.
- Check for leaks. If water leaks from any of the connections merely tighten the connections
until the leak stops.
- Repeat the same- procedure for the hot side
Metal washer
Brass lock nut
Plastic washer
Diverter
Rubber washer
Metal washer
Brass lock nut
1355AC _ _
PAGE 03
Medium Allen Key
Handle Top
Handle Bell
Handle Flange