beautypg.com

Assembly, Installation – new construction, After showerspa is mounted to the wall – PULSE ShowerSpas 1047W-CH Mirage User Manual

Page 5: Shelf assembly (optional), Hand shower holder assembly, Hand shower assembly, Extensive remodel – new finished wall surface

background image

5

Assembly

After unpacking your ShowerSpa, some assembly is required prior to installation.

Shelf Assembly (optional)

1. Line up screw holes located on bottom of ShowerSpa with screw holes located on top of shelf (8) and place screws (12) in holes.

2. Secure washer (13) and nut (14) to each screw (12).

Hand Shower Holder Assembly

1. Insert hand shower holder (4) into hole located on side of ShowerSpa and secure with washer (16) and nut (15).

2. Secure nut (15) with adjustable wrench if needed.

3. Connect hand shower supply line from diverter to hand shower holder. Securely tighten to ensure no leaks. (Caution - do not overtighten)

After ShowerSpa is mounted to the wall

Hand Shower Assembly

1. Insert washer (3) into hexagon shaped end of hand shower hose (5) and attach to threaded outlet on bottom of ShowerSpa. Do not over-

tighten.

2. Insert washer (3) into tapered end of hand shower hose (5) and attach to hand shower (2). Insert hand shower into holder (4).

Installation – New Construction

Extensive Remodel – New Finished Wall Surface

1. Prior to sheetrock, stub-out ½" hot and cold supply lines beyond

finished wall surface, 4" on center. For best results, attach 90°
brass fittings (available at most hardware stores) to the stub-outs
maintaining ¼" – ½" of space between the fitting and finished
wall. The open end of the 90° brass fittings should point down so
the ShowerSpa's supply lines attach parallel to wall.

1

2. For a person 5'8" – 6'2" we recommend stub-outs be 44" above

finished floor.

2

3. Before installation, make certain water is COMPLETELY TURNED

OFF to both hot & cold supply lines of shower.

4a. Mark location of holes for top mount, making sure holes are

level. For a person 5'8" – 6'2", we recommend placing holes of
upper mount at approx. 61 ¼" above finished floor.

3

4b. To determine location for lower mount measure distance

between indents on bottom edge of horizontal mounting bars
on back of ShowerSpa (approx. 27 ¾"). Using this distance,
measure down from holes in upper mount to obtain location of
holes in lower mount making certain mounts are plumb.

4c. Use mounts to mark location of holes for each mount.

5. Before drilling holes, make certain that connecting to stub-outs

DOES NOT INTERFERE with backside of ShowerSpa and it is flush
with finished wall at desired mounting height.

2

6. Drill ¼" holes through wall surface using a masonry bit. Drill

slowly through wall surface to avoid cracking and chipping. Insert
anchors and securely screw brackets to wall. Before connecting
hot and cold supply lines, hang ShowerSpa on wall, check height
and make sure ShowerSpa is flush against wall with a secure fit.

7. Connect hot and cold water supply lines to stub-outs—DO NOT

OVERTIGHTEN. Before mounting ShowerSpa, check fittings to
make sure they are secure. Turn on water and check for leaks.
When fittings are leak-free, mount ShowerSpa on wall.

8. OPTIONAL—Seal around body of ShowerSpa with a bead of

silicone. DO NOT SEAL BOTTOM.