beautypg.com

5 software setup – NORAC 5465BC User Manual

Page 12

background image



9

5 Software Setup

1. Start up your sprayer and test the sprayer’s functionality. The display terminal does not

need to be powered on for the original boom function switches to operate. Unfold the
booms and raise/lower each boom and the main section.

Confirm that the cabling and hoses are agreeable to the entire range of motion.

2. If any functions do not work, review the hydraulic and electrical portions of this manual to

check for proper installation.

3. Turn on the power for the display terminal using the switch on the side.

4. The procedure for the installation of the Spray Height Control system is now complete.

Begin the AUTOMATIC SYSTEM SETUP procedure as described in the UC5 or UC4.5

Spray Height Control Operator’s Manual.