beautypg.com

2 valve block mounting – NORAC UC5-BC-FT01 User Manual

Page 25

background image



22

10.2 Valve Block Mounting

1. Mount the valve block on the center section of the boom as illustrated in Figure 22.

2. Insert the threaded rod into the block and use a hex nut to hold the rod. The block holes

are 3/8” NC-1” deep. If bolts are used instead of the threaded rod, ensure the bolts thread
in at least 3/8”.

3. Use the remaining hardware to secure the block to the sprayer.

4. Cut off excess threaded rod, if necessary.

Figure 22: Valve Block Mounting