beautypg.com

3 input module – NORAC UC5-BC-JD10 User Manual

Page 26

background image



23

8.3 Input Module

1. Install the input module (E03) on the boom near the John Deere valve block. Secure it to

the boom using cable ties or optional brackets.

2. Connect the CANbus cable (C02) from the valve module to the input module.

3. Insert the 12 pin plug (P02) into the OEM 3 connector on the end of the input module

Figure 25: Input Module Connections

4. Connect the 12 pin connector on the tilt interface cable (C20) to the Thru 2 connector on

the side of the input module. Insert the other connectors on C20 into the tilt connectors
on the John Deere solenoids (Figure 26).

5. Connect the 12 pin connector on the main lift interface cable (C21) to the Thru 1

connector on the side of the input module. Insert the other connectors on C21 into the

main lift connectors on the John Deere solenoids (Figure 26).