6 hydraulic installation, 1 valve assembly – NORAC UC4+BC+FC2 User Manual
Page 20
18
4.6
H
YDRAULIC
I
NSTALLATION
WARNING!
The hydraulic system creates very
high pressure. Before disconnecting
any hydraulic lines ensure all pressure
has been bled from the system.
When changing the boom hydraulic
hoses leave the booms in
TRANSPORT POSITION.
IMPORTANT:
Component failure due to oil
contamination is not covered under
the UC4+ System warranty. It is
recommended that a qualified
technician does the hydraulic
installation.
4.6.1 Valve Assembly
1. On a clean surface remove all plastic
plugs from the NORAC hydraulic Valve
(V01) (Figure 20).
2. Install the 6MB-6MJ fittings (F05) on the
"P" and "T" ports and tighten to 18 ft-
lbs.
Figure 20: NORAC Valve Block
3. Install the orifices (F06) into the "B"
ports with the notch facing
outwards as shown in Figure 21. An
O-ring pick can be used to ease
installing the orifices into their locations.
4. Install the 6MB-6MJ fittings (F05) into
the "B" ports and tighten to 18 ft-lbs.
5. Install the 6MBP plugs (F02) into the
"A" ports and tighten to 18 ft-lbs.
Figure 21: Valve Block Assembly