beautypg.com

NORAC UC4.5-CS4 User Manual

Page 15

background image



12

1. Locate the end of the previously installed valve extension cable (C11) at the rear of the

sprayer.

2. Disconnect the 6-pin shroud on C12 from the 6-pin tower on C11 and connect the 6-pin

connectors on cable C17 between the cables.

3. Connect the 3-pin shroud labeled “Connect to C11” on cable C17 to the free 3-pin tower

on C11.

4. Connect cable C19 to the 3-pin shroud on cable C17.

5. Connect the 2-pin connector on cable C19 marked ROLL CCW to the coil on the port

side of the valve block. The port side is the side of the valve block with the left and right tilt
hoses.

6. Connect the 2-pin connector on cable C19 marked ROLL CCW to the other free coil.

The pigtails on cable C19 are not used for this installation.

7. Connect the main lift sensor to the 8-way coupler using cable C07 and a 2-way coupler

(E12). Cable C07 and item E12 may not be needed if the 8-way coupler is mounted close
enough to the main lift sensor.

8. Tie up all cabling so that it will not interfere with any components on the sprayer.