beautypg.com

3 electrical installation, 1 control panel mounting, 2 cable installation – NORAC UC4.5-BC-GN2 Part 2 User Manual

Page 6

background image



3

3 Electrical Installation

3.1 Control Panel Mounting

Install the UC4.5 Control Panel (E01) in the cab of the sprayer. Mount the panel where it will
be clearly visible and within easy reach of the operator. The location must facilitate connecting
the power cable (C10) to the back of the UC4.5 Control Panel.

A good spot to mount the UC4.5 control panel is on the right hand side of the cab to the Roll
Over Protection Bar (ROP). Four pilot holes for the screws provided need to be drilled to
facilitate the control panel mounting.

Another option is to purchase an adapter for the flexible panel mount that has a 3/8" NC
threaded stud on the end to bolt through an existing mount. These are available at your local
outdoor store as a RAM mount part number RAM-B-236. (See

http://www.ram-mount.com/

)

3.2 Cable Installation

1. Connect C10 to the UC4.5 Control Panel in the sprayer cab.
2. Route the plug end (P12/P6) of C10 to the exterior of the cab and connect to R12/R6 of

C11 at the hitch. Ensure cable is routed in a safe manner to avoid damage. Cable tie C10
to the RAM mount to help provide strain relief.

3. Connect P6A or power cable to an appropriate power supply.

Figure 1: UC4.5 Power and Valve Extension Cables