beautypg.com

Cabletron Systems SEH-34 User Manual

Page 42

background image

CONNECTING TO THE NETWORK

Page 4-4

4.

Check that the link LED on the 10BASE-T Ethernet device and the
applicable LNK LED on the SEH are on. If the LEDs are not on,
perform each of the following steps until the LEDs are on:

a.

Check that the 10BASE-T device and the SEH have power.

b.

Verify the cabling between the SEH and the 10BASE-T device.

c.

Check the cable for continuity.

If a link has not been established, contact Cabletron Systems
Technical Support.

4.1.3

Connecting a UTP Segment to an EPIM-T

Before connecting a segment to the EPIM-T, check each end of the
segment to determine if the wires have been crossed-over for the
proper connection. If the wires do not cross over, use the switch on the
EPIM-T to internally cross over the RJ45 port. Refer to Figure 4-3 to
properly set the EPIM-T cross-over switch.

Figure 4-3. EPIM-T Cross-over Switch

Position =
(not crossed over)

1. TX+
2. TX-
3. RX+
4. NC

5. NC
6. RX-
7. NC
8. NC

Position X
(crossed over)

1. RX+
2. RX-
3. TX+
4. NC

5. NC
6. TX-
7. NC
8. NC

This manual is related to the following products: