Produits Neptune SHOWER TOWER User Manual
Page 3

3
SHOWER TOWER INSTALLATION GUIDE
• Read completely and thoroughly this guide before proceeding;
• Assure that all material and parts are intact are not missing;
• It is strongly recommended to contact a certified plumber to complete the installation;
• Wear security glasses, protective gloves and clothing during installation;
• Make sure to have all the needed tools for installation as pictured below;
• It is important to have a second person to assist during the entire installation for reasons of security and to
facilitate the task;
• Respect at all times your local building codes;
• The installation of dedicated shut-off valves upstream from the water supply is preferable.
GENERAL INFORMATION
REQUIRED TOOLS
64
1
/2
"
(
16
38
m
m
)
8" (203 mm)
4 1/4" (108 mm)
18" (456 mm)
3" (76 mm)
5 1/2" (140 mm)
ThermostaƟc valve
On/Off valve hand shower
On/Off valve body jets
On/Off valve shower head
TECHNICAL DRAWING