GreenStar Solaris User Manual
Page 10

Green Star Products Inc.
6900 Alamo Downs Pkwy. Ste. 120, San Antonio TX 78238
www.greenstarled.com
Steps:
1. Choose the mounting spot
The spot must be able to hold the light’s weight and be close to the
electrical installation.
2. Identify the incoming current and voltage
Measure the incoming voltage and identify the cables (phase, neutral, and
ground). Make sure that the light is right for this incoming voltage. All
Solaris are 85VAC-285VAC.
3. Mark the spots to drill
Take off the light’s mount and place it on the desired position in the ceiling.
Mark those spots.