Pre lighting check, Commissioning – Charnwood Country 15B User Manual
Page 9
knob is turned.
Before initial lighting the following
points should be checked :-
1. The bottom grate bars must all be
fitted and should move freely and
easily when the riddling mechanism is
operated.
2. The plates round the sides and back
of the grate must be in position and
sitting correctly.
3. The throat plate must be fitted in the
PRE LIGHTING
CHECK
roof of the appliance and should be
checked to ensure that it has not
become dislodged in transit. The
method of location and positioning of
the throat plate is shown in Fig. 3.
On completion of the installation and
after allowing a suitable period of time
for the fire cement and mortar to dry
out, the stove should be lit and
checked to ensure that smoke and
fumes are taken from the appliance up
the chimney and emitted safely. Also
check all joints and seals.
The central heating pump should be
COMMISSIONING
adjusted to give the correct water flow
against the circuit resistance and the
system should be correctly balanced.
On completion of the installation and
commissioning please leave the
operating instructions with the
customer and advise on the use of the
appliance and any controls on the
system.
389
655
616
334
Ø154
882
340
857
487
937
815
136
45
Country 15B Dimensions
(All dimensions are in mm)
Boiler tappings are 1" BSP Female
Flue outlet may be top or rear
Page 8
Country 15B 09/03