Addendum: joined welding plates – Flintec 52-28 User Manual
Page 8
52-28 Application Guidlines, Rev. 1.00 September 2012
Page 8 of 8
Addendum: Joined Welding Plates
Preparation:
Step 1 Alternative 1:
Step 1 Alternative 2:
Step 2:
Step 3:
www.flintec.com
Welding plates welded to load carrier
(e.g. tank foot)
Welding plates welded to
foundation
Foundation
Foundation
Load carrier
Load carrier
•
Position the load carrier
•
Weld or tackweld the unwelded welding plate to
the foundation or the load carrier
•
Remove the joining bar
•
Lift the load carrier to the required height
•
Finish welding, if required
•
Install the weigh modules
Foundation
Foundation
Load carrier
Load carrier
Threads of upper and lower welding
plated centred
Joining bar (for easy removal tackwelded on
one side only)
Joined welding plates