Installation of Light and Filter Fixtures

Once the ceiling grid is installed, the fixture installation can begin. If “lay-in” light fixtures are to be used, they should be installed

first in order to make the wiring easier. Once the light fixtures are in place and wired, the filter modules can be installed. This is

done by pushing the filter fixture through the grid at an angle and then lowering them until they nest in place. After all the filter

modules are in place, the blank ceiling panels are installed. Installation of Ceiling Tiles Blank panels are placed in the grid

opening after the gasket is in place. Special cuts can be made by measuring from the center line of the grid and deducting 7/8”

from that dimension, (see chart below). For example, a 24 1/2” x 48 1/2” grid centerline would take a blank 23 5/8” x 47 5/8”

in size. If the blank panel hold down clips are utilized, a minimum of six (6) clips per 2’ x 4’ blank panel are required. The clips

are secured to the T-Grid extrusions utilizing a 1⁄4”-20 bolt.

Center Line of Grid - 24 1⁄2” x 48 1⁄2”

Module, Fixture, and Ceiling Tile Size - 23 5/8”x 47 5/8”

CAUTION: Be extremely careful when installing HEPA filters. Be careful not to touch the face of the filter (bottom of

the fixture). This can cause damage to the HEPA filter unit and may need replacing.

Sealing Wall Angle

This is a simple process utilizing an approved construction sealant. A bead of sealant is placed at the corner of the wall angle

and existing wall on the room side. The sealant should be applied to assure an airtight seal.

Maintenance

Prior to completing the installation, a final inspection and wipe-down should take place. Wipe the panels and extrusions with

an approved cleanroom alcohol wipe. If any chemicals are to be utilized, spot check with extra materials prior to use to insure

that the finish of the wall system is not damaged.

Cleaning of the Envirco MAC-T Ceiling Grid requires the use of non-shedding, cleanroom approved wipers and a solvent of

isopropyl alcohol diluted with distilled water.