EDCO VORTEX-300 User Manual
Page 6
E-VORTEX300-I-0110
Printed in USA
©2010
TVW
Page 6
100 Thomas Johnson Drive, Frederick, MD 21702-4600 USA
Phone (301) 663-1600 • 1-800-638-3326
Fax (301) 663-1607 • 1-800-447-3326
Website: www.edcoinc.com
Email: [email protected]
HEPA Filter Removal and Installation
NOTE: All HEPA fi lter machines are equipped with a differential pressure gage. The gage measures the pressure
above against the pressure below the fi lter, thereby measuring the restriction of airfl ow due to contamination.
HEPA fi lters should be replaced when the gage consistently measures 4 inches W.C.
1. Turn the machine on then block the inlet with a fl at and rigid material to place the machine under vacuum pressure.
2. Remove the motor deck socket truss screws.
3. Turn the machine off and disconnect the power source.
4. Remove the motor deck and silencer hood together.
5. Remove the four lock nuts retaining the two HEPA fi lter brackets.
6. Remove the HEPA fi lter brackets and HEPA fi lter.
7. Center the new fi lter on the HEPA adapter plate gasket side down.
8. Position the provided lengths of self-adhering fl at gasket material on the HEPA fi lter frame (if not already done) to
cushion the HEPA fi lter brackets.
9. Replace the HEPA fi lter brackets then thread the locking nuts over the rods and tighten.
CAUTION: Do not over tighten. The effectiveness of the fi lter may be compromised if its frame is bent.
10. Seat the motor deck on the HEPA fi lter housing spacer.
11. Connect the power source.
12. Turn the machine on then block the inlet with a fl at and rigid material to place the machine under vacuum
pressure.
13. Secure the motor deck then turn the machine off.
Motor Deck Inspection
1. Turn the machine on then block the inlet with a fl at and rigid material to place the machine under vacuum pressure.
2. Remove the motor deck socket truss screws.
3. Turn the machine off and disconnect the power source.
4. Remove the silencer hood assembly and motor deck separately.
CAUTION: The motor deck of this unit can be very heavy. Follow safe lifting procedures.
5. Turn the motor deck over on a table to inspect the belt for cracks, ware, melt, stretch and tension (make sure to
support the motor and turbine equally).
6. Use a knife to clear the three turbine mounting slots of silicone.
7. Loosen the three nuts securing the turbine enough to slide the turbine forward.
8. Remove the belt.
9. Check the turbine and motor bearings for noise by hand.
Belt Installation
1. After the preceding motor deck inspection.
2. Place the belt over both pulleys making sure to match the grooves in the belt with both pulleys.
3. Use a spanning device between the turbine and motor pulleys to tension the belt.
4. Maintain tension while tightening the three nuts that secure the turbine.
5. Check that the corresponding grooves on the turbine and motor pulleys are aligned using the motor deck as a
reference plane.
NOTE: The pulleys are normally aligned at the factory, but if adjustment is needed remove the motor pulley to access
to the relevant shims.
6. Seat the motor deck on the housing spacer.
CAUTION: The motor deck of this unit can be very heavy. Follow safe lifting procedures.