Operating instructions – ebm-papst S3G300-AL11-50 User Manual

Page 7

background image

Operating instructions

S3G300-AL11-50

Translation of the original operating instructions

4.3.1 Preparing connection lines for the connection

Strip the cable just enough so that the screwed cable gland is tight and
the terminals are relieved of strain. Tightening torque, see chapter 3.1
Product drawing.

4.3.2 Connecting cables with terminals

WARNING
Terminals and connections have voltage even with a
unit that is shut off
Electric shock
→ Wait five minutes after disconnecting the voltage at all poles

before opening the device.

; Remove the cap from the screwed cable gland.
Remove the cap only in those places where cables are inserted.
; Insert the line(s) (not included in the standard scope of delivery) into

the terminal box.

; First connect the "PE" (protective earth) connection.
; Connect the lines to the corresponding terminals.
Use a screwdriver to do so.
During the connection work, ensure that no cables splice off.
; Seal the terminal box.

4.3.3 Cable routing

No water may penetrate along the cable in the direction of the cable gland.

Fans installed lying flat
Make sure that the cable is routed in the form of a loop (water trap).

Fig. 2: Fan installed lying flat, cable routed as a water trap.

Fans installed in upright position
When routing the cable, ensure that the screwed cable glands are
arranged at the bottom. The cables must always be routed downwards.

Fig. 3: Cable routing for fans installed upright.

Item no. 51266-5-9970 · Revision 80549 · Release 2014-02-17 · Page 7 / 11