beautypg.com

Tool set up, Workpiece and work area set up – Harbor Freight Tools ITEM 92037 User Manual

Page 10

background image

Page 10

For technical questions, please call 1-800-444-3353.

Item 92037

Operating instructions

Read the entiRe imPORtant SaFetY inFORmatiOn section at the beginning of this

manual including all text under subheadings therein before set up or use of this product.

inspect tool before use, looking for damaged, loose, and missing parts.

if any problems are found, do not use tool until repaired.

tool Set up

tO PRevent SeRiOuS injuRY FROm aCCiDental OPeRatiOn:

turn off the tool, detach the air supply, safely discharge any residual air pressure in the tool, and

release the trigger before performing any inspection, maintenance, or cleaning procedures.

tO PRevent SeRiOuS injuRY:

Do not adjust or tamper with any control or component in a way not specifically explained within this manual.

improper adjustment can result in tool failure or other serious hazards.

Installed Chisel

Retainer Spring

Chisel

Cylinder

Figure D

1. Unscrew the Retainer Spring from the Cylinder.

2. Insert the 10 mm Chisel shank into the Cylinder.

3. Screw in the Retainer Spring completely

onto the threads of the Cylinder until it stops,

to solidly hold the Chisel in place.

4. Pull firmly on the Chisel to make 

sure it is secured in place.

Workpiece and Work area Set up

1. Designate a work area that is clean and well-lit.

The work area must not allow access by children

or pets to prevent distraction and injury.

2. Route the air hose along a safe route to reach

the work area without creating a tripping hazard

or exposing the air hose to possible damage.

The air hose must be long enough to reach

the work area with enough extra length to

allow free movement while working.

3. Secure loose workpieces using a vise or clamps

(not included) to prevent movement while working.

4. There must not be hazardous objects

(such as utility lines or foreign objects) nearby

that will present a hazard while working.

Sa
Fet

Y

O

Pe

R

ati

O

n

m

aintenan

C

e

Setu

P