Installation, Mounting the extractor – CDA 3L9 User Manual
Page 7

6
Installation
IMPORTANT:
The extractor is intended to be mounted to the ceiling 
using fixings appropriate for the ceiling. Ensure that 
there is adequate ceiling strength and supports at the 
fixing points; if in doubt, consult a joiner or electrician.
INSTALLATION:
The extractor is intended to be operated as a re-circulation 
device suspended from the ceiling, as shown in Fig 11.
When installing this appliance over a CDA hob, the clearance 
between the extractor and the hob must be equal to or exceed 
650mm. This instruction overrides the instructions supplied 
with the CDA hob. (The height should be measured from the 
top of the hotplates or burners)
Where the extractor is to be installed above a non-CDA hob, 
the instructions supplied with the hob may dictate that the 
height required above the hob is greater than 650mm.
IN THE ABSENCE OF ANY INSTRUCTIONS SUPPLIED 
WITH THE HOB, THE MINIMUM DISTANCE BETWEEN 
THE HOB AND EXTRACTOR MUST BE AT LEAST 760mm
Mounting The Extractor
1. Using the supplied template, mark the positions of the 3 
 
main fixing holes (E) and the 2 additional fixing holes (X)
on the ceiling.
2. Drill and plug the holes, as required. If screwing 
 
directly to the ceiling joists, plugs may not be required
(See Important note above)
3. Insert 3 screws (E) into the main fixings, leaving 
 
approximately 3mm protruding, as shown in Fig 12.
Fig. 11
650mm
Fig. 12
min 3mm
E
E
E
E
