Junction box – Chamberlain LA412 User Manual
Page 25
6
JUNCTION BOX
The following items are required to complete the junction box installation:
• 4 x 4 Junction Box with 3/4" NPT threaded port holes
• Screws
• PVC Conduit
Open the junction box by removing screws (4) and set aside.
Mount the junction box within 5' of second operator.
Junction Box
Cover
Junction Box
Mov
ing
Gate Can
Ca
use
Inju
ry o
r Death
KEE
P CL
EAR!
Gate
may
mo
ve a
t any
tim
e wit
hout
pri
or w
arn
ing.
Do
not
let c
hild
ren
ope
rate
the
gat
e o
r
play
in the
gat
e ar
ea.
This
entr
ance
is f
or vehic
les o
nly
Pedest
rians
mu
st use
sepa
rate
ent
ran
ce
Control Box
Gate Operator (Gate 1)
Gate Operator (Gate 2)
Extension Cable
Within 5’
Within 5' PVC conduit
(not provided) to protect
the power cable for solar
panel and low voltage
wire from lawn mowers
and string trimmers.
25
Wiring
Junction Box
Solar Panel
(facing South)
Screws (4)