beautypg.com

Unpacking, Assembling the fire pit – Snow Joe SJFP30 Fire Joe 30-Inch Steel Fire Pit User Manual

Page 4

background image

Unpacking

NOTE: Before beginning assembly, make sure that all of

the parts and hardware listed below are present. If any part

is missing or damaged, do not attempt to assemble the

product. Contact the Snow Joe

®

+ Sun Joe

®

customer service

department at 1-866-SNOWJOE (1-866-766-9563).

Parts

1. Screen hook

4. Fire bowl

2. Screen 5. Connecting ring
3. Log grid

6. Leg (3)

Hardware

7. M6 x 8 mm bolt (9)
8. M6 ring screw
9. M6 flange nut

10. M6 nut (3)

Assembling the Fire Pit

Tools required (not included): Phillips screwdriver

Choose a soft and level location for assembly. Remove all

parts from the packaging, and check for missing parts.

1. Attach the 3 legs to the connecting ring using three

(3) M6 x 8 mm bolts and three (3) M6 nuts (Fig. 1).

2. Place the fire bowl upside down, and connect the legs to

the fire bowl using the remaining six (6) M6 x 8 mm bolts

(Fig. 2).

3. Attach the M6 ring screw to the top of the screen and

secure it with the M6 flange nut (Fig. 3).

Fig. 1

Hardware used: M6 x 8 mm bolt (3)

Leg

Connecting

ring

M6 x 8 mm

bolt

Hardware used: M6 nut (3)

M6 nut

Fig. 2

Hardware used: M6 x 8 mm bolt (x6)

Fire Bowl

M6 x 8 mm

bolt

Fig. 3

Hardware used: M6 ring screw

Hardware used: M6 flange nut

Screen

M6 ring screw

M6 flange

nut

4