Acolyte RibbonLyte in Recessed Channel User Manual
Page 4

All artwork and images copyright Acolyte Industries Inc.
Use or reprinting prohibited unless explicitly approved by Acolyte Industries.
I N S TA L L AT I O N - - S T E P S 5 - 8
5
7
6
8
PA G E 3
Clean the mountain surface free of dust
and debris using a wet cloth. For metal
mounting surfaces use rubbing alcohol (C)
to wipe clean.
After surface is dry, apply 1/16” double-sided
tape (D) to the desired mounting path of
your RibbonLyte in your channel.
(D)
Remove backing from double-sided tape
(D).
(D)
Remove the backing from the RibbonLyte
(E) that you are going to be applying atop
the double-sided tape.
(C)
(E)
This manual is related to the following products: