beautypg.com

Installation – Desa Tech FIREBOX CGFB32CC User Manual

Page 11

background image

www.fmiproducts.com

124970-01A

11

6. If using an optional perimeter trim kit,

install the trim after final finishing and/or

painting of wall. See instructions included

with trim accessory for attaching trim.

7. Install and properly test gas log heater.

Follow installation instructions included

with the vent-free gas log heater that is

being installed.

IMPORTANT: When finishing your firebox,

combustible materials such as wall board,

gypsum board, sheet rock, drywall, plywood,

etc. may be butted up next to the sides and top

of the firebox. Combustible materials should

never overlap the firebox front facing.

WARNING: do not allow any

combustible materials to overlap

the firebox front facing.

IMPORTANT: Noncombustible materials such

as brick, tile, etc. may overlap the front facing,

but should never cover any necessary open-

ings like louvered slots.

WARNING: do not allow

noncombustible materials to

cover any necessary openings

like louvered slots.

WARNING: use only non-

combustible mortar or adhe-

sives when overlapping the front

facing with noncombustible

facing material.

INSTALLATION

Continued

Figure 7 - Attaching Firebox to Wall Studs

Nailing

Flanges

Nails or Wood

Screws

INstAllING FIRebox usING

optIoNAl AccessoRy mANtels

warninG: a qualified ser-

vice person must install firebox.

follow all local codes.

This firebox may be installed using a cabinet

mantel accessory against a wall in your

home. The firebox and cabinet mantel can

be installed directly on the floor. A trim kit is

included with the mantel accessories. Follow

instructions with mantel for installation.

INstAllING GAs lINe

notiCe: a qualified service per-

son must connect heater to gas

supply. follow all local codes.

IMPORTANT: See Connecting to Gas Supply

in your log set owner’s manual for details on

gas hookup.
You may run the gas line from either side of

the firebox (see Figure 8). Decide which side

you want to run the gas line from.
Note: This is one option for installing shutoff

valve. Check local codes for equipment shut-

off valve location requirements.

Figure 8 - Installing Gas Line and

Equipment Shutoff Valve (Model May

Vary From Illustration)

Knockout

Locations

(Knock Out

One Hole)

Gas Line Hole

Equipment Shutoff

Valves (Install One)