2 preparation items, 2.2 daily inspection, 2.2. daily inspection – NISSAN 2011 LEAF - Roadside Assistance Guide User Manual
Page 35
5-2 Preparation Items
Preparation Items
Specification
Purpose
PPE (personal protective
equipment):
Insulated gloves
Up to 1,000V
For protection from high voltage electri-
cal shock
Insulated shoes
–
Safety shield
–
Wrenches
Size:10mm
To remove the service plug access
cover bolts.
To remove the 12V battery terminal bolt.
S
olvent resistant protection
gloves
Solvent resistant protection
shoes
–
To utilize in the event of a Li-ion battery
electrolytic solution leak.
–
Absorbent pad
The same pad used for internal com-
bustion engine fluids can be used.
To absorb any Li-ion battery electrolytic
solution leakage.
Standard fire fighting
equipment
Standard fire fighting equipment
Depending on type of fire (vehicle or
battery) use standard fire fighting
equipment (water or extinguisher).
To extinguish a fire.
Insulated tape
Insulating
To cover any damaged harnesses to
protect from and prevent electrical
shock. Tape should cover all bare or
damaged wire.
5-2.1 PPE (Personal Protective Equipment) Protective Wear Control
Perform an inspection of the PPE items before beginning work. Do not use any damaged PPE items.
5-2.2 Daily Inspection
This inspection is performed before and after use. The worker who will be using the items should perform
the inspection and check for deterioration and damage.
• Insulated rubber gloves should be inspected for scratches, holes and tears. (Visual check and air
leakage test)
• Insulated safety boots should be inspected for holes, damage, nails, metal pieces, wear or other
problems on the soles. (Visual check)
• Insulated rubber sheet should be inspected for tears. (Visual check)
35