beautypg.com

FASS T F14 220G User Manual

Page 12

background image

D.

Secure PFB-2002 and RS-2001 with (1) hex bolt

1/2” -20 x 1 1/2” and (1) 1/2” washer to PFB-2002C

C.

Insert PFB-2002C in to bed channel align the nut with the opening on the channel.

.

E

Route FASS wire harness/wire extension along the frame rail to fac-
tory lift pump. Remove the power lead from the factory lift pump.
Be sure to finish connecting wire harness before mounting into
position.