FASS T F14 220G User Manual
Page 12
D.
Secure PFB-2002 and RS-2001 with (1) hex bolt
1/2” -20 x 1 1/2” and (1) 1/2” washer to PFB-2002C
C.
Insert PFB-2002C in to bed channel align the nut with the opening on the channel.
.
E
Route FASS wire harness/wire extension along the frame rail to fac-
tory lift pump. Remove the power lead from the factory lift pump.
Be sure to finish connecting wire harness before mounting into
position.
See also other documents in the category FASS Water equipment:
- T D07 095G (20 pages)
- T D07 220G (20 pages)
- T D08 095G (19 pages)
- T D08 220G (21 pages)
- T D09 095G (19 pages)
- T D10 125G (20 pages)
- T D02 095G (19 pages)
- T F17 125G (21 pages)
- T F17 200G (21 pages)
- T F17 220G (21 pages)
- T F16 095G (19 pages)
- T F16 220G (20 pages)
- T F16 260G (20 pages)
- T F14 125G (21 pages)
- T F14 200G (21 pages)
- T C11 095G (20 pages)
- T C10 095G (20 pages)
- T C10 220G (21 pages)
- T 095G (23 pages)
- T 220G (23 pages)
- T 260G (23 pages)
- T UIM 150G (23 pages)
- T UIM 220G (23 pages)
- T UIM 260G (23 pages)
- T 080G (23 pages)
- T 125G (23 pages)
- T 200G (23 pages)
- FA D05 095G (16 pages)
- FA D05 220G (16 pages)
- FA D05 260G (16 pages)
- FA D07 095G (16 pages)
- FA D07 220G (16 pages)
- FA D07 260G (16 pages)
- FA D08 095G (16 pages)
- FA D08 220G (18 pages)
- FA D08 260G (18 pages)
- FA D09 095G (15 pages)
- FA D10 125G (18 pages)
- FA D10 220G (19 pages)
- FA D10 240G (19 pages)
- FA D02 095G (15 pages)
- FA F17 125G (19 pages)
- FA F17 200G (19 pages)
- FA F17 220G (19 pages)