FASS T F17 125G User Manual
Page 9
The installation of the electrical harness is done first, allowing power to be applied to the pump for
lubrication purposes.
F.
Route WH-1005 wire harness along frame rail to mounting location of pump. Completion of this step
will be addressed in the mounting step.
56
E.
Connect the WE-1001 Extension to the WH-1005’s shorter relay branch. Route the extension to the
engine bay fuse panel. Remove a fuse (maximum of 10A) that is “hot” when the key is on. Example:
#54 or #55. Use a test probe to locate the “hot side” of the circuit in the fuse block. Install the fuse
tap into the open location. Install the pulled fuse into the open space on the fuse tap. Disconnect the
vehicles’ battery and continue installation.
See also other documents in the category FASS Water equipment:
- T D07 095G (20 pages)
- T D07 220G (20 pages)
- T D08 095G (19 pages)
- T D08 220G (21 pages)
- T D09 095G (19 pages)
- T D10 125G (20 pages)
- T D02 095G (19 pages)
- T F17 200G (21 pages)
- T F17 220G (21 pages)
- T F16 095G (19 pages)
- T F16 220G (20 pages)
- T F16 260G (20 pages)
- T F14 125G (21 pages)
- T F14 200G (21 pages)
- T F14 220G (21 pages)
- T C11 095G (20 pages)
- T C10 095G (20 pages)
- T C10 220G (21 pages)
- T 095G (23 pages)
- T 220G (23 pages)
- T 260G (23 pages)
- T UIM 150G (23 pages)
- T UIM 220G (23 pages)
- T UIM 260G (23 pages)
- T 080G (23 pages)
- T 125G (23 pages)
- T 200G (23 pages)
- FA D05 095G (16 pages)
- FA D05 220G (16 pages)
- FA D05 260G (16 pages)
- FA D07 095G (16 pages)
- FA D07 220G (16 pages)
- FA D07 260G (16 pages)
- FA D08 095G (16 pages)
- FA D08 220G (18 pages)
- FA D08 260G (18 pages)
- FA D09 095G (15 pages)
- FA D10 125G (18 pages)
- FA D10 220G (19 pages)
- FA D10 240G (19 pages)
- FA D02 095G (15 pages)
- FA F17 125G (19 pages)
- FA F17 200G (19 pages)
- FA F17 220G (19 pages)