Operation Instructions

1. Fill the base with a sample of fresh concrete according to ASTM

C231 specifications. Next, strike off the base level full with the strike

off bar that is furnished with the instrument. Wipe top of base and

cover clean.

2. Clamp cover on securely, with petcocks open.
3. Using the supplied syringe, inject water through one petcock until

all the air is displaced and expelled through the opposite petcock.

Leave petcocks open at the time.

4. With the built-in pump, pump air to the initial pressure line on the

gauge.

5. Wait a few seconds and stabilize hand on dial at the initial pressure

by pumping up or bleeding off with the air release valve, whichever

is necessary.

6. Close both petcocks, then press down on the needle valve lever to

release the air into the base. Hold the needle valve lever down a

few seconds while lightly tapping on the gauge with your finger to

stabilize the hand on the gauge.

7. Read the percent of entrained air in the concrete on the dial.
8. After you release the pressure, clean the base, cover and petcock

openings thoroughly with running water. To check the accuracy,

refer to the calibration instructions below.

To Check Calibration of Meter Gauge

1. Fill the base full with water.
2. Screw on the short piece of straight tubing supplied with the unit

into the threaded petcock hole located on the underside of the

cover. Clamp the cover on the base with the tubing extended down

into the water.

3. With both petcocks open, add water with the syringe through the

petcock until all of the air is forced out of the opposite petcock.

Leave both petcocks open.

4. Pump up air pressure to a little beyond the pre-determined initial

pressure line on the gauge. Wait a few seconds for the compressed

air to cool to normal temperature and then stabilize the gauge hand

at the proper initial pressure line by pumping or bleeding off as

needed.

3