beautypg.com

Amico Noble Custom Cabinet User Manual

Page 6

background image

5

Amico Architectural

Other Installation Notes

Make all gas and electrical connections between the NICU unit and gas and electrical sources.

The electrical termination may be located in the base, in the chase, or could just be loose

conduit extending outside the chase. See wiring diagrams provided with each project.

Division 15 to make gas pipe connections from base to chase, and connect gas stubs from chase

to building medical gas supply lines previously roughed in.

Division 16 to do all electrical connections required.

5.

1.

2.