beautypg.com

Great Plains 2015 Operator Manual User Manual

Page 14

background image

2015 Three-Point Soybean Machine 173-088M

4/18/05

12

Great Plains Mfg., Inc.

Section 3 Basic Operation

Hitching:

The following steps should be done when preparing to
hitch the drill to the tractor.

1.

Raise or lower 3-Point arms on the tractor as need-
ed and install the lower hitch pins. Pin the top 3-
Point link to the drill. Category II in the lower hole,
Category III in the upper hole.

2.

Slowly raise the drill! Watch for cab interference!

3.

Unpin the stand tubes. Rotate up into storage posi-
tion and repin.

NOTE: Do not stand between the tractor and the im-
plement during hitching.